Research Article
Cement Slurry Plugging Law and Optimal Plugging Flow Rate at a High Hydraulic Gradient
Table 3
Scheme for determining the optimal plugging flow rate.
| Test number | Water-cement ratio | Injection pressure (MPa) | Hydrodynamic velocity (m·s−1) |
| 1-1a/1b | 0.8 : 1 | 0.1 | 0.15 | 1-2a/2b | 0.8 : 1 | 0.2 | 0.35 | 1-3a/3b | 0.8 : 1 | 0.3 | 0.25 | 1-4a/4b | 1 : 1 | 0.2 | 0.25 | 1-5a/5b | 1 : 1 | 0.3 | 0.15 | 1-6a/6b | 1 : 1 | 0.1 | 0.35 | 1-7a/7b | 1.5 : 1 | 0.3 | 0.35 | 1-8a/8b | 1.5 : 1 | 0.1 | 0.25 | 1-9a/9b | 1.5 : 1 | 0.2 | 0.15 |
|
|