Research Article
Suspender Replacement Method for Long-Span Concrete-Filled Steel Tubular Arch Bridges and Cable Force Measurement Based on Frequency Method
Table 1
Suspender replacement method.
| Replacement method | Schematic | Advantages | Disadvantages |
| Bridge deck support method | | (1) Structural force is easy to analyse | (1) It is suitable only for a suspender with slight damage | (2) Less work at high altitude | (2) Building the beret beam requires a heavy workload | Temporary pocket hanging method | | (1) Stress clear | (1) It is difficult to control the internal force of the steel wire rope and elevation of bridge deck | (2) Less construction equipment | (2) High technical difficulty | (3) Easy to operate | (3) More amount of work at a height | (4) Large temporary load | Temporary suspender method | | (1) Less construction equipment | (1) Need to prepare a cushion block | (2) Clear system transformation | (2) High altitude operation is inconvenient |
|
|