Suspender Replacement Method for Long-Span Concrete-Filled Steel Tubular Arch Bridges and Cable Force Measurement Based on Frequency Method

Table 2

Standard value of boom tension under dead load.

Suspender no.Cable force (kN)

X1w,n740.6
X2w,n720.3
X3w,n713.4
X4w,n716.9
X5w,n717.8
X6w,n718.0
X7w,n717.0
X8w,n718.3
X9w,n725.5
X10w,n735.6
734.9
725.7
715.1
718.6
718.6
717.7
715.9
716.3
719.1
740.0
S1w,n740.6
S2w,n720.3
S3w,n713.4
S4w,n716.9
S5w,n717.8
S6w,n718.0
S7w,n717.0
S8w,n718.3
S9w,n725.5
S10w,n735.6
734.9
725.7
715.1
718.6
718.6
717.6
715.9
716.3
719.1
740.0