Research Article

Suspender Replacement Method for Long-Span Concrete-Filled Steel Tubular Arch Bridges and Cable Force Measurement Based on Frequency Method

Table 8

Error between calculated cable force and actual cable force.

Suspender no.Measured cable (kN)Calculated cable (kN)Deviation rate (%)

S2n770720.4−3.46
S3n756.8745.4−1.50
S2w761724.1−4.84
S3w749.6746.2−0.45
X2n753743−1.33
X3n758707−4.08
X2w749739−1.39
X3w7037100.93