Research Article

Initial Parameters Affecting the Multilayer Doubly Curved Concrete Shell Roof

Figure 2

Making the formwork and pouring concrete layers: (a) make the formwork, (b) the first layer of steel fibres concrete was poured, and (c) the normal concrete layer is poured last.
(a)
(b)
(c)