Research Article
Initial Parameters Affecting the Multilayer Doubly Curved Concrete Shell Roof
Figure 2
Making the formwork and pouring concrete layers: (a) make the formwork, (b) the first layer of steel fibres concrete was poured, and (c) the normal concrete layer is poured last.
(a) |
(b) |
(c) |