Research Article

Optimization of Stope Structure Parameters Based on the Mined Orebody at the Meishan Iron Mine

Figure 6

The layout of monitoring system: (a) monitors on the roof of the drift near drawing point; (b) monitors; (c) video on the roof of the drift near drawing point; (d) monitors next to the ore pass; (e) monitoring station.