Research Article

Optimization of Stope Structure Parameters Based on the Mined Orebody at the Meishan Iron Mine

Table 3

Stope structure parameter scheme.

SchemeHeight (m)Drift spacing (m)

11820
22018
32020
42220
52420
62422