Case Study on the Stability Control of Broken Surrounding Rock in Roadway Excavation on the Edge of a Collapsed Stope Area

Table 1

Summary of grouting drilling arrangement parameters.

NumberingOrifice position (m)Hole numberDrilling angle (°)Drill length (m)

1Y1
H = −240
ZK1−6.021.0
ZK2−31.025.0
ZK3−53.035.0

2Y2
H = −240
ZK1−6.026.0
ZK2−24.035.0
ZK3−39.034.0
ZK4−53.043.0

3Y3
H = −240
ZK120.026.0
ZK20.034.0
ZK3−16.043.0

4Y4
H = −40
ZK128.025.0
ZK20.035.0
ZK3−29.034.0
ZK4−64.043