Case Study on the Stability Control of Broken Surrounding Rock in Roadway Excavation on the Edge of a Collapsed Stope Area
Table 1
Summary of grouting drilling arrangement parameters.
| Numbering | Orifice position (m) | Hole number | Drilling angle (°) | Drill length (m) |
| 1 | Y1 H = −240 | ZK1 | −6.0 | 21.0 | ZK2 | −31.0 | 25.0 | ZK3 | −53.0 | 35.0 |
| 2 | Y2 H = −240 | ZK1 | −6.0 | 26.0 | ZK2 | −24.0 | 35.0 | ZK3 | −39.0 | 34.0 | ZK4 | −53.0 | 43.0 |
| 3 | Y3 H = −240 | ZK1 | 20.0 | 26.0 | ZK2 | 0.0 | 34.0 | ZK3 | −16.0 | 43.0 |
| 4 | Y4 H = −40 | ZK1 | 28.0 | 25.0 | ZK2 | 0.0 | 35.0 | ZK3 | −29.0 | 34.0 | ZK4 | −64.0 | 43 |
|
|