Analysis of Stress and Deformation Characteristics of Deep-Buried Phyllite Tunnel Structure under Different Cross-Section Forms and Initial Support Parameters Table 3 Stress results (unit: MPa).
WC R (cm)MP 1 MP 2 MP 3 MP 4 MP 5 MP 6 MP 7 WC V 1300 −1.14 −1.32 −1.26 −2.08 −2.07 −2.29 −2.29 1000 −1.15 −1.34 −1.28 −2.07 −2.09 −2.27 −2.30 700 −1.12 −1.31 −1.27 −2.07 −2.08 −2.37 −2.40 WC II 1300 −0.64 −0.56 −0.86 −1.16 −1.16 −1.30 −1.30 1000 −0.65 −0.56 −0.86 −1.16 −1.16 −1.22 −1.24 700 −0.64 −0.55 −0.86 −1.15 −1.15 −1.19 −1.20 WC III 1300 −0.56 −0.49 −0.98 −1.14 −1.15 −1.68 −1.69 1000 −0.58 −0.47 −0.95 −1.14 −1.15 −1.25 −1.27 700 −0.56 −0.47 −0.95 −1.14 −1.14 −1.21 −1.20