Construction Sequence Optimization and Settlement Control Countermeasures of Metro Tunnels Underpassing Expressway

Table 3

The vault settlement value of the tunnel and haunch horizontal convergence value under different construction schemes (unit: mm).

Monitoring pointsP1P2P3S1S2S3

Case 1−6.81−6.28−42.13−4.76−4.24−12.24
Case 2−8.16−9.18−46.89−4.72−4.23−12.36
Case 3−10.32−9.38−52.58−4.83−4.26−12.60