Research Article

Construction Sequence Optimization and Settlement Control Countermeasures of Metro Tunnels Underpassing Expressway

Table 7

The vault settlement value of the tunnel and haunch horizontal convergence value under different construction schemes (unit: mm).

Feature pointsP1P2P3S1S2S3

Before reinforcement−6.81−6.28−42.13−4.56−4.14−12.24
After reinforcement−1.50−1.51−20.17−1.21−1.04−13.08