Research Article
The Risk Assessment of Debris Flow Hazards in Banshanmen Gully Based on the Entropy Weight-Normal Cloud Method
Figure 7
Cloud of each assessment index generated by the forward cloud generator. (a) The length of replenishment section . (b) Longitudinal slope of main ditch . (c) The gradient of side slope . (d) The length of ditch and reserves of loose substance . (e) The drainage area . (f) Rainfall
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |