Research Article

The Risk Assessment of Debris Flow Hazards in Banshanmen Gully Based on the Entropy Weight-Normal Cloud Method

Table 3

The synthetic parameters of debris flow.

Name of ditchThe length of replenishment section X1 (%)Longitudinal slope of main ditch X2 (‰)The gradient of side slope X3 (°)The length of ditch X4 (Km)Reserves of loose substance X5 (104 m3/km2)Drainage area X6 (km3)Rainfall X7 (mm)

Main ditch0.14460.03920.08610.38980.07650.66270.1018
1#branch ditch0.09550.07460.09490.07070.07650.04780.0993
2#branch ditch0.09550.08540.09490.07110.07650.03570.0978
3#branch ditch0.09550.07720.09490.06510.07650.03250.096
4#branch ditch0.09550.08820.09490.09810.07650.06730.094
5#branch ditch0.09550.10060.09490.06740.07650.03240.0957
6#branch ditch0.10350.11080.09490.07630.12760.2950.1046
7#branch ditch0.10670.13160.1170.06220.26020.03070.1061
8#branch ditch0.09870.13570.11040.05020.07650.02450.1025
9#branch ditch0.09870.16290.1170.04910.07650.03690