Research Article

Case Study on BIM and Value Engineering Integration for Construction Cost Control

Table 11

Potential cost saving as a result of VE and BIM application in ten thousand RMB (USD).

Building componentsOriginal costCost after VE and BIMDifference

Civil engineering7766.46 (1143.07)6575.20 (967.74)1191.26 (175.33)
Installation project3069.31 (451.74)3069.31 (451.74)0
Decoration engineering2175.17 (320.14)1865.82 (274.61)309.35 (45.53)
Total13010.94 (1914.95)11510.33 (1694.09)1500.61 (220.86)