Research Article

Design Method for Specific Charge in Deep Mining considering Influence of In Situ Stress

Table 4

Drilling quantity comparison at Hongtoushan Copper Mine.

Blasting zoneOriginal parametersTest schemePercentage reduction of no. of blast holes (%)Percentage reduction of length of blast holes (%)
No. of blast holesLength of blast holes (m)No. of blast holesLength of blast holes (m)

I2021655.61611323.220.320.1
II2541960.42101635.417.316.6
III1701527.41461320.914.113.5
IV3112558255211118.017.5
V2542246.91931736.924.022.7
Total11919948.39658127.519.018.3