Research Article
A DSM-Based CCPM-MPL Representation Method for Project Scheduling under Rework Scenarios
| Name | Description |
| | Element in row and column of the design structure matrix | | Matrix represents the STS relationship between activities | | Matrix represents the FTF relationship between activities | | Equal to | | Equal to zero | | Matrix represents activity durations | | An n × 1 matrix with all elements equal to zero | | Earliest finish time of an activity | | Earliest start time of an activity | | A 1 × n matrix with all elements equal to zero | | Maximum of the earliest finish time for all activities | | Latest start time of an activity | | Overlap duration between activity and | | Learning curve of activity | | Rework time of activity caused by activity | | Rework time of activity caused by activity 1 to | | First rework time of activity caused by activity | | Total time of the second rework of activity | | Total safety time of activity | | Rework safety time of activity | | Activity safety time of activity | | Location of feeding buffers |
|
|