Research Article
Risk Analysis of Tunnel Construction Scheme Change based on Field Monitoring and Numerical Analysis
Table 2
Comparison of field monitoring and simulation data.
| Measuring point | Surface subsidence (DB57-4) (mm) | Settlement of vault in tunnel (GD-K0 + 295.5) |
| Monitoring value | 11.9 | 15.6 mm | Calculated value | 7.1 | 11.97 mm |
|
|