Research Article
Analysis of Ground Movement during Large-Scale Pipe Roof Installation and Artificial Ground Freezing of Gongbei Tunnel
Figure 11
Pipe roof model and vertical ground deformation at the end of three stages. (a) Pipe roof model. (b) Stage I of pipe jacking. (c) Stage II of pipe jacking. (d) Stage III of pipe jacking.
(a) |
(b) |
(c) |
(d) |