Research Article

Compaction Quality Inspection Method of Soil-Rock Filled Embankment Based on Continuous Compaction Control Technology

Figure 7

mean and their corresponding VCV mean. (a) WC 1; (b) WC 2; (c) WC3; (d) WC 4; (e) WC 5; (f) WC 6; (g) WC 7; (h) WC 8.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)