Research Article
Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System Dynamics
Figure 6
Simulation results of mining plan arrangement: (a) relationship between original driving speed and current driving speed; (b) relationship between current driving speed and driving footage; (c) relationship between original driving footage and current driving footage; (d) relationship between working face advancing distance and current driving footage.
(a) |
(b) |
(c) |
(d) |