Research Article
Water Inrush Risk Assessment Based on AHP and Advance Forecast Approach: A Case Study in the Micangshan Tunnel
Table 9
Calculation results of hierarchical single sorting.
| Sorting layer | W | | CI | RI | CR |
| V-U | 0.50 | 0.06 | 0.29 | 0.03 | 0.12 | 5.3537 | 0.0884 | 1.12 | 0.079 | U1-C | 0.63 | 0.11 | 0.26 | | | 3.0385 | 0.01925 | 0.58 | 0.033 | U2-C | 0.83 | 0.17 | | | | 2 | 0 | 0 | 0 | U3-C | 0.25 | 0.75 | | | | 2 | 0 | 0 | 0 | U4-C | 0.50 | 0.5 | | | | 2 | 0 | 0 | 0 | U5-C | 0.65 | 0.07 | 0.28 | | | 3.065 | 0.0325 | 0.58 | 0.056 |
|
|