Research Article

Internet of Things-Based Concrete Curing Invention for Construction Quality Control

Table 5

Record of concrete surface temperature and dampness in Experiment A.

Sample/timeSurface temperatureSurface dampness
Air-based curing (°C)IoT-based curing (°C)Manual-based curing (°C)Air-based curing (%)IoT-based curing (%)Manual-based curing (%)

0 minutes20.121.624.842.642.541
10 minutes19.920.624.740.245.350
20 minutes19.820.624.841.345.650
30 minutes19.920.624.541.043.650
40 minutes19.819.924.539.346.645.9
50 minutes19.720.024.519.841.145.0
60 minutes19.319.324.519.841.941.5
70 minutes19.319.324.319.941.741.4
80 minutes19.319.524.511.341.937.6
90 minutes19.619.624.310.241.138.5
100 minutes19.419.524.210.741.437.1
110 minutes19.419.424.611.643.035.5
120 minutes19.319.424.711.339.435.3
130 minutes19.319.624.511.341.133.2
140 minutes19.419.525.011.444.035.5
150 minutes19.920.025.011.743.633.8
160 minutes19.919.825.311.341.833.3
170 minutes19.819.925.311.445.032.7
180 minutes19.519.625.511.241.333.4
190 minutes20.019.625.011.644.132.6
200 minutes19.519.525.511.542.033.8
210 minutes19.419.424.710.644.633.6
220 minutes19.619.325.111.145.032.9
225 minutes20.020.024.611.735.533.7