Research Article
Field Test and Numerical Studies on Influences of PVD Spacing on Vacuum Treatment Effects of Dredged Slurry
Table 3
Layered settlements and compressions.
| | Depth (m) | Layered settlement (mm) | Unit compression (mm/m) |
| T1 (900 mm) | 0 | 576.4 | — | −1 | 512.7 | 63.7 | −3 | 262.6 | 125.05 | −5 | 57.5 | 102.55 | −7 | — | 28.75 |
| T2 (800 mm) | 0 | 645.9 | — | −1 | 574.6 | 71.3 | −3 | 285.5 | 144.55 | −5 | 63.1 | 111.2 | −7 | — | 31.55 |
| T3 (700 mm) | 0 | 691.6 | — | −1 | 611.5 | 80.1 | −3 | 303.7 | 153.9 | −5 | 67.5 | 118.1 | −7 | — | 33.75 |
|
|