Research Article
Method to Realize the Tilt Monitoring and Instability Prediction of Hazardous Rock on Slopes
Table 3
Comparison of the predicted failure time and actual failure time in field monitoring.
| Category | Predicted failure time (Tpf) (h) | Actual failure time (Taf) (h) | (h) |
| Field monitoring | Trend 1 | 1821.360 | 1841.430 | −20.07 h | Trend 2 | 1806.960 | −34.47 h | Trend 3 | 1842.460 | −1.03 h |
|
|