Research Article

Method to Realize the Tilt Monitoring and Instability Prediction of Hazardous Rock on Slopes

Table 3

Comparison of the predicted failure time and actual failure time in field monitoring.

CategoryPredicted failure time (Tpf) (h)Actual failure time (Taf) (h) (h)

Field monitoringTrend 11821.3601841.430−20.07 h
Trend 21806.960−34.47 h
Trend 31842.460−1.03 h