Research Article

Prevention and Control of Spontaneous Combustion of Residual Coals in Acid-Soaked Goaf in Gas Drainage Condition

Table 1

Experimental scheme design conditions setting.

Serial numberProcessing conditionsFor the wind speedHeating rate

1Raw coal50 mL/min1.0°C/min
2Five-day immersedAir dry for 24 h
3Soak in weakly acidic waterAir dry for 24 h
4Preoxidation to 40°C
5Preoxidation to 55°C
6Preoxidation to 70°C