Research Article
Use of a Full Factorial Design to Study the Relationship between Water Absorption and Porosity of GP and BW Mortar Activated
Figure 5
Correlation between the observed and predicted responses (RC7 (a), RC14 (b), RC28 (c), water absorption (d), and porosity (e)) at 28 days.
(a) |
(b) |
(c) |
(d) |
(e) |