Research Article
Mixed Production Line Optimization of Industrialized Building Based on Ant Colony Optimization Algorithm
Table 1
The work content of the specific process.
| Process | Activity | Description of activity content |
| 1 | Mould cleaning | Clean the contaminants remaining in the steel film, and clean the mold table, the mold is sprayed with isolating paint | 2 | Die installation | Install the mould of the production component | 3 | Steel skeleton and mesh installation | Place the steel skeleton in the mould for positioning and binding the mesh | 4 | Preinstalled embedded parts | Installation and fixing of embedded parts | 5 | Professional inspection | Confirm that the dimensions and positions of molds, embedded parts, holes, etc. are correct | 6 | Concrete pouring | Pour the concrete according to the production plan and fully vibrate it | 7 | Maintenance components | According to the requirements of components and construction period, adopt different maintenance strategies | 8 | Components demoulding and lifting | Strictly follow the order of technical disclosure requirements to demould and lift | 9 | Stacking and storage | Stack finished components that meet the strength requirements in the storage area |
|
|