Research Article

Mixed Production Line Optimization of Industrialized Building Based on Ant Colony Optimization Algorithm

Table 2

The size and amounts of different types of prefabricated walls.

Parameter TypeSize (Length × Height × Thickness)Amount
Production period 1Production period 2Production period 3

Model 11.5 × 1.8 × 0.3897
Model 22.4 × 1.8 × 0.3688
Model 31.8 × 1.8 × 0.3455
Model 43.6 × 1.8 × 0.38108
Model 52.0 × 2.0 × 0.24667
Model 61.6 × 2.0 × 0.24867
Model 73.2 × 2.0 × 0.241068
Model 83.0 × 2.0 × 0.24888