Research Article
Mixed Production Line Optimization of Industrialized Building Based on Ant Colony Optimization Algorithm
Table 2
The size and amounts of different types of prefabricated walls.
| Parameter Type | Size (Length × Height × Thickness) | Amount | Production period 1 | Production period 2 | Production period 3 |
| Model 1 | 1.5 × 1.8 × 0.3 | 8 | 9 | 7 | Model 2 | 2.4 × 1.8 × 0.3 | 6 | 8 | 8 | Model 3 | 1.8 × 1.8 × 0.3 | 4 | 5 | 5 | Model 4 | 3.6 × 1.8 × 0.3 | 8 | 10 | 8 | Model 5 | 2.0 × 2.0 × 0.24 | 6 | 6 | 7 | Model 6 | 1.6 × 2.0 × 0.24 | 8 | 6 | 7 | Model 7 | 3.2 × 2.0 × 0.24 | 10 | 6 | 8 | Model 8 | 3.0 × 2.0 × 0.24 | 8 | 8 | 8 |
|
|