Research Article

Assessment of Fractures in Excavation Damaged Zone around Roadways of an Iron Mine Using Optical Televiewer Detecting Method

Table 3

The percentage of effective length of each partition and its percentage in the effective length of corresponding hole.

Hole numberTotal length/mEffective length/mIntact rock mass/effective length (%)Joint zone/effective length (%)Fracture zone/effective length (%)Broken zone/effective length (%)

131.7312.8518.031.032.818.2
214.6714.450.025.343.031.7
314.7414.7429.941.426.32.4
413.2513.1223.815.537.723.0
513.5713.5728.654.915.31.2
614.047.60.090.010.00.0
713.6713.670.057.436.66.0
813.2912.94.739.855.50.0
913.8613.7836.121.532.69.9
1013.5613.340.741.115.92.3
1113.7313.618.515.341.924.3
1213.6113.5311.220.835.232.9
1313.4813.40.035.551.313.1
1412.056.760.037.30.062.7
1512.7512.670.044.843.611.6
1611.7310.340.063.227.99.0
1712.3512.030.022.763.314.0
1912.5611.927.845.733.912.6
2012.553.620.029.855.814.4
2113.8413.840.041.746.212.1
2212.4112.140.032.035.932.0
2312.412.40.047.741.910.5
Total of IV grade surrounding rock138.36116.8715.729.338.516.5
Total of II and III grade surrounding rock107.7295.4410.946.530.612.0
Total of horizontal hole63.7653.921.741.040.816.5