Research Article

Stress Performance Evaluation of Shield Machine Cutter Head during Cutting Piles under Masonry Structures

Figure 1

Relative position of the Zhenghe 1#: (a) schematic plane location of the tunnel and Zhenghe 1# building; (b) schematic elevation of the tunnel and Zhenghe 1# building.
(a)
(b)