Stress Performance Evaluation of Shield Machine Cutter Head during Cutting Piles under Masonry Structures

Figure 8

Deformation of buildings at various critical moments of shield cutting pile group construction. (a) Deformation of buildings when shield tunnels are not under construction. (b) The left-line shield cutter head starts to cut the pile group composite foundation. (c) Left-line shield tail separated from pile group composite foundation. (d) The shield tail of the left line is away from the pile group composite foundation for 15 days.