Maximum differential settlement and maximum distortion of the building at each critical moment in the construction of shield cut group piles.

Monitoring itemsTime ATime BTime CTime D

Maximum differential settlement (mm/m)7.438.188.428.37
Maximum distortion (rad/m)1.65 × 10−23.376 × 10−23.368 × 10−23.12 × 10−2