Research Article

Study on the Solution of Sand Slabbing in the Tailing Sand Bin of Huanggang Iron Ore Mine

Table 1

Gravity of total tailings.

DescriptionUnitsFirst testSecond testThird testAverage value

Total tailingsg/m33.223.253.233.23