Review Article

Effect of Agricultural Crop Wastes as Partial Replacement of Cement in Concrete Production

Table 13

The energy necessary to produce the cement (En) and the energy performance (Ep) of mortars at 28 days. [24].

Mix samplesEn (kWh/t)Ep (kWh/t/MPa)

Control112.003.07
20% BLA98.562.06
10% BLA10% SCBA98.562.16