Research Article
Rainfall & Seismological Dump Slope Stability Analysis on Active Mine Waste Dump Slope with UAV
Figure 15
(a–c) represent the saturation profiles of section 1, section 2, and section 3, respectively, with a flow time of 7 months.
(a) |
(b) |
(c) |