Research Article

Simulation-Based Tracking Test and Optimization of Large-Tonnage Box Girder Transport with Trolley on an Erected Bridge

Figure 11

Tracking test of 40 m bearing box girder. (a) Stress measuring points arrangement (cm). (b) The field loading test.
(a)
(b)