Research Article

Simulation-Based Tracking Test and Optimization of Large-Tonnage Box Girder Transport with Trolley on an Erected Bridge

Table 4

The control parameters for three-stage construction of prestressed tension.

NumberSpecificationNumber of holesAnchorage stress of prestressed tension (MPa)Minimum strength requirement of concrete (MPa)

1N2–B4493025
2N4–N1–B3–N3–B11093040
3N2–N4–B4–N1–B3–N3–B2–B116139550