Research Article

Reduction of Seepage Risks by Investigation into Different Lengths and Positions for Cutoff Wall and Horizontal Drainage (Case Study: Sattarkhan Dam)

Figure 2

The studied locations. (a) Section 1. (b) Section 2. (c) Under the dam core. (d) Claw of the dam.
(a)
(b)
(c)
(d)