Research Article

Reduction of Seepage Risks by Investigation into Different Lengths and Positions for Cutoff Wall and Horizontal Drainage (Case Study: Sattarkhan Dam)

Table 4

The values of the parameters in the initial state.

ParameterValue

Total seepage from Section 1 (m3/s/m2)0.019899
Total seepage from Section 2 (m3/s/m2)0.017735
Average uplift pressure (MPa)502.35
Exit gradient0.96888