Research Article

Reduction of Seepage Risks by Investigation into Different Lengths and Positions for Cutoff Wall and Horizontal Drainage (Case Study: Sattarkhan Dam)

Table 5

The values of the parameters in point no 1.

ParameterValue

Total seepage from Section 1 (m3/s/m2)0.019689
Total seepage from Section 2 (m3/s/m2)0.017499
Average uplift pressure (MPa)560.13
Exit gradient0.96423