Research Article

Reduction of Seepage Risks by Investigation into Different Lengths and Positions for Cutoff Wall and Horizontal Drainage (Case Study: Sattarkhan Dam)

Table 6

Different positions of the cutoff wall (considering the length of 10 meters of the cutoff wall).

Position no.Distance from the heel of the core (m)

10
25
310
415
520
625
730
836