Research Article
Development an Artificial Neural Network Model for Estimating Cost of R/C Building by Using Life-Cycle Cost Function: Case Study of Mexico City
Table 5
Input vector of the second ANN model.
| Input parameter | Units | Input parameter | Units |
| Number of bays X direction | | b | cm | Number of bays Y direction | | h | cm | STory levels | | Ase | cm2 | Bays spacing X | | Ase' | cm2 | Bays spacing Y | | Asm | cm2 | Dead load design factor | | Asm' | cm2 | Live load design factor | | se | cm | Seismic load design factor | | sm | cm | b | cm | b | cm | h | cm | h | cm | Ase | cm2 | As | cm2 | Ase' | cm2 | s | cm | Asm | cm2 | b | cm | Asm' | cm2 | h | cm | se | cm | As | cm2 | sm | cm | s | cm | b | cm | b | cm | h | cm | h | cm | Ase | cm2 | As | cm2 | Ase' | cm2 | s | cm | Asm | cm2 | | | Asm' | cm2 | | | se | cm | | | sm | cm | | |
|
|