Research Article

Research on Deformation Law of Deep Foundation Pit of Station in Core Region of Saturated Soft Loess Based on Monitoring

Table 2

Main items of foundation pit monitoring.

Serial numberMonitoring itemsMonitoring instrumentMeasuring point layoutMeasurement accuracyAllowance

1Surface settlement around the pitLevelArrange 2 rings along the circumference of the pit, the first ring is 2.0 m away from the periphery of the foundation pit, the second ring is 8 m away from the periphery of the first ring, and the distance between the measuring points of each ring is 10–20 m1.0 mm0.3%H or ≤30 mm, whichever is smaller

2Horizontal displacement of diaphragm wallTheodolite Total stationLayout along with the middle and outside corners of the periphery of the foundation pit, with a spacing of no more than 20 m, and no less than 3 underground continuous walls on each side1.0 mm0.2%H or ≤30 mm, whichever is smaller

3Support axial forceAxial force gauge Strain gaugeThe deformation of the diaphragm wall is set at the same monitoring section, and the vertical supports at the same section position are set at measuring points0.15%F.s0.8f

4Groundwater levelWater-level pipe Water-level meterThe midpoint of the long and short sides of the foundation pit, and the distance between 20 and 50 m when the foundation pit is large, needs to be combined with the precipitation plan5.0 mm