Research Article
Research on the Reuse of Discharged Soil from EBP Shield Tunnels in Synchronous Grouting Material
Table 10
Hardening parameters of the grout.
| Hardening parameters of the grout | Simulation step 2 | Simulation step 3 | Simulation step 4 | Simulation step 5 | Simulation step 6 | Off ring for 0∼8 h | Off ring for 8∼16 h | Off ring for 16∼24 h | Off ring for 1∼7 d | Off ring for 7∼28 d |
| E/MPa | 5 | 15 | 30 | 100 | 200 | λ | 0.45 | 0.42 | 0.37 | 0.32 | 0.24 | ρ/kg·m−3 | 1900 | 1900 | 1900 | 1900 | 1900 |
|
|