Research Article
Research on the Reuse of Discharged Soil from EBP Shield Tunnels in Synchronous Grouting Material
Table 15
Seepage grouting conditions.
| Grouting pressure uniformly distributed on the whole ring (MPa) | 0.18 |
| Injection rate of the grout (%) | 100 | 120 | 140 | 160 | 180 | 200 | Thickness of permeable grout-soil mixed layer (m) | 0.000 | 0.106 | 0.209 | 0.308 | 0.405 | 0.500 |
|
|