Research Article

Research on the Reuse of Discharged Soil from EBP Shield Tunnels in Synchronous Grouting Material

Table 15

Seepage grouting conditions.

Grouting pressure uniformly distributed on the whole ring (MPa)0.18

Injection rate of the grout (%)100120140160180200
Thickness of permeable grout-soil mixed layer (m)0.0000.1060.2090.3080.4050.500