Research Article

Research on the Reuse of Discharged Soil from EBP Shield Tunnels in Synchronous Grouting Material

Table 4

Material proportions of uniform experimental design (6.5 kg for each group).

NumberRatio
C (cement) (kg)F (fly ash) (kg)S (sand in muck) (kg)B (silty clay in muck) (kg)W (water) (kg)Ratio (C : F: S : B: W)

10.5581.6752.6590.2681.3401 : 3: 4.76 : 0.48 : 2.4
20.4201.7652.6010.1841.5301 : 4.2 : 6.19 : 0.44 : 3.64
30.6261.5022.5330.1361.7021 : 2.4 : 4.05 : 0.22 : 2.72
40.4201.5132.4790.3481.7401 : 3.6 : 5.9 : 0.83 : 4.14
50.6741.2142.4210.3021.8881 : 1.8 : 3.6 : 0.45 : 2.8
60.4821.7362.8440.1061.3311 : 3.6 : 5.9 : 0.22 : 2.76
70.7131.2832.7720.3351.3971 : 1.8 : 3.89 : 0.47 : 1.96
80.4901.4702.7220.2511.5681 : 3: 5.56 : 0.51 : 3.2
90.3721.5622.6860.1391.7411 : 4.2 : 7.22 : 0.37 : 4.68
100.5091.2222.6230.4151.7311 : 2.4 : 5.15 : 0.82 : 3.4
110.3891.6353.0670.1941.2151 : 4.2 : 7.88 : 0.5 : 3.12
120.5791.3912.9850.1651.3791 : 2.4 : 5.15 : 0.29 : 2.38
130.3861.3902.9610.3411.4211 : 3.6 : 7.67 : 0.88 : 3.68
140.6201.1152.8910.3121.5611 : 1.8 : 4.67 : 0.5 : 2.52
150.4291.2872.8610.2061.7171 : 3: 6.67 : 0.48 : 4