Research Article

Dynamic Analysis of Construction and Demolition Waste Management System (A Case Study of Tehran, Iran)

Figure 2

(R) The causal loop of impacts of the population and GDP on construction. (B1) The causal loop of the impact of mining on reducing construction. (B2) The causal loop of the impact of the C&D waste generation on reducing construction. (B3) The causal loop of the impact of the C&D waste cost on reducing the demand for housing. (B4) The causal loop of the impact of the cost of natural stone materials production on the reduction of housing demand.