To what extent are the following indicators considered and implemented in this design? | Scale | Total points | Scores gained | Cluster Wms (%) | Group Wms (%) |
0 not implemented 3 considered 5 highly implemented | Weight |
|
Financial performance 19.07% | OPEX | VFI11 | Maximise residual value | 1.829 | 5 | 17 | 9.145 | 67.49 | 73.80 |
VFI6 | Increase economic lifetime | 1.963 | 5 | 9.814 |
VFI15 | Optimise risk-return ratio of alternative options | 1.819 | 3 | 5.458 |
VFI2 | Efficiency of operational expenditure (OPEX) | 1.987 | 2 | 3.973 |
VFI5 | Improve economic efficiency | 2.001 | 2 | 4.002 |
CAPEX | VFI3 | Maximise the cost efficiency to build | 1.891 | 4 | 20 | 7.564 | 80.19 |
VFI1 | Efficiency of capital expenditure (CAPEX) | 1.991 | 5 | 9.957 |
VFI12 | Minimise cost of capital | 1.872 | 1 | 1.872 |
VFI4 | Deliver/achieve cost certainty | 1.877 | 5 | 9.384 |
VFI9 | Return on investment | 1.839 | 5 | 9.193 |
Functional performance 35.49% | Longevity | VFU26 | Provide functional ability of the foundations requirements (strength and stability) | 1.915 | 5 | 34 | 9.575 | 97.04 | 96.62 |
VFU27 | Ensure substructure functional requirements meet a satisfactory level of performance | 1.91 | 5 | 9.551 |
VFU28 | Ensure superstructure functional requirements meet a satisfactory level of performance | 1.92 | 5 | 9.599 |
VFU2 | Increase life of services | 2.039 | 4 | 8.157 |
VFU3 | Provide function-fitness for purpose | 2.044 | 5 | 10.220 |
VFU23 | Configure design to enable an efficient construction process | 2.006 | 5 | 10.029 |
VFU24 | Ensure construction efficiency is considered in specification | 1.968 | 5 | 9.838 |
Reliability | VFU19 | Maintain security-health and safety | 1.929 | 5 | 53 | 9.647 | 96.35 |
VFU21 | Meet all statutory requirements and building regulations | 1.972 | 5 | 9.862 |
VFU22 | Ensure designed elements are standardised | 2.053 | 5 | 10.267 |
VFU20 | Suitability and maintainability of materials | 2.034 | 4 | 8.138 |
VFU15 | Provide durable building-last longer | 1.929 | 5 | 9.647 |
VFU14 | Assure convenience | 1.987 | 5 | 9.933 |
VFU18 | Create reliable building—safer | 1.972 | 5 | 9.862 |
VFU1 | Maintain adaptable building-useful to all | 2.006 | 5 | 10.029 |
VFU8 | Increase efficiency-add capacity | 1.91 | 5 | 9.551 |
VFU13 | Provide disability access | 1.968 | 5 | 9.838 |
VFU16 | Maintain durability | 1.925 | 4 | 7.698 |
Operational performance 17.66% | Manageability | VOP8 | Easy to operate | 1.92 | 5 | 21 | 9.599 | 83.91 | 79.89 |
VOP6 | Easy to maintain | 1.905 | 5 | 9.527 |
VOP9 | Easy to inspect and maintain | 1.896 | 5 | 9.479 |
VOP11 | Provide building systems that are easy to operate and control | 1.905 | 5 | 9.527 |
VOP15 | Reduce operational risk | 1.92 | 1 | 1.920 |
Energy and efficiency | VOP1 | Reduce/minimise/save energy usage | 2.087 | 4 | 15 | 8.348 | 75.16 |
VOP2 | Maintain efficiency in terms of energy | 2.12 | 4 | 8.481 |
VOP3 | Increase efficiency of utilities | 1.944 | 4 | 7.775 |
VOP4 | Increase efficiency of heating, cooling, and lighting | 1.963 | 3 | 5.888 |
Environmental performance 15.66% | Ecoresources | VEN5 | Increase use of natural ventilation | 1.982 | 2 | 14 | 3.964 | 55.98 | 42.87 |
VEN3 | Provide indoor environmental quality | 1.982 | 4 | 7.927 |
VEN4 | Access to natural light, management of air quality, and temperature | 2.034 | 3 | 6.103 |
VEN7 | Specifying low-maintenance, durable, environmentally preferable materials, and equipment | 1.991 | 2 | 3.983 |
VEN10 | Minimise consumption of resources | 1.91 | 3 | 5.731 |
Adaptability | VEN8 | Maximise resource reuse | 1.891 | 0 | 3 | 0.000 | 20.35 |
VEN12 | Respond to site microclimate | 1.882 | 1 | 1.882 |
VEN11 | Conserve water resources | 1.991 | 2 | 3.983 |
Management performance 12.12% | Control | VMA10 | Able to construct to scope/cost/budget/schedule/quality | 1.972 | 3 | 12 | 5.917 | 80.13 | 76.78 |
VMA11 | Completed to specification | 2.039 | 4 | 8.157 |
VMA6 | Produce effective plans to achieve the project objectives | 2.011 | 5 | 10.053 |
Planning | VMA3 | Create strategic planning | 1.982 | 5 | 11 | 9.909 | 73.47 |
VMA1 | Provide effective project management and delivery | 2.13 | 4 | 8.520 |
VMA5 | Provide cost control to achieve the project objectives | 1.987 | 2 | 3.973 |
|